Ladders and wedges
Insertion of 1st barrel in the South trough
2 Barrels in the South trough
BA-1 in 10% test stand
Mating of barrel BA-4 with F-disk FD-06
BA-4 and FD-6 in 10% test stand
3 Barrels in South trough
End F-disks
Insertion end F-disks in the South trough
(09/28/00)
H-disks
South 1/2-cylinder
South 1/2-cylinder cabling
Bon Voyage South 1/2 cylinder!
North 1/2-cylinder