DŲ Run IIb L2-L5 Stave Design Review

September ??, 2003 at FNAL

Agenda

 

DŲ Run IIb Stave Design Review:

Information for the Design Review Committee:

·         General DŲ Run IIb Stave Design:

o         

·         General Quality Assurance:

o         

·         Results on Prototype Assemblies:

o        Assembly and sensor alignment tolerances

o        Mechanical testing of structures

o        Electrical performance of prototype stave 

·         Talks for the PRR session:

o        W. Cooper: Project Overview

o        J. Fast: Stave design details

o        G. Lanfranco: Mechanical testing

o        D. Olis: Thermal testing

·         Reply notes to questions from the PRR

o         

·         Recent Talks given in Run IIb meetings:

o         

Final Documents from the PRR:

·          

Back to DŲ Run IIb Mechanical Page


Contact Persons:

·         Jim Fast mailto:(jfast@fnal.gov)

o        Fermilab

o        Office: SiDet (A-B Bridge)

o        Phone: +1-630-840-6332

o        Fax: +1-630-840-4264

o        Address: Fermilab, MS 310, 500 Wilson Road, Batavia, IL 60510, U.S.A

 

·         Bill Cooper (cooper@fnal.gov)

o        Fermilab

o        Office: D0 Assembly Building, Trailer 177

o        Phone: +1-630-840-4657

o        Fax: +1-630-840-8481

o        Address: Fermilab, MS 352, 500 Wilson Road, Batavia, IL 60510, U.S.A