Information from the DØ Experiment for the April 2002

Fermilab PAC Meeting

 

Documents provided for the Physics Advisory Committee

 

One page cover letter  ß  read this first

Responses to the Director’s Technical Review Committee

Simulation studies of the Silicon Detector and scope options

 

Status reports from the DOE program review of Fermilab, March 2002:

The current status of  DØ in Run 2a (John Womersley) PDF file

Run 2b status (Jonathan Kotcher) PDF file

 

Updated Silicon Technical Design Report PDF file

(Chapters 4, 7 and 9 have been modified)

 

Talks given at the PAC meeting on April 12, 2002:

Status of DØ,  H.Weerts

Run 2b Triggers,  D.Wood

Silicon Detector scope options, M. Demarteau

 