WBS |
Task |
Start |
Finish |
M&S $ |
Inst. |
Funding |
FNAL Labor |
|
1.6 |
Layer 0 Silicon Detector |
11/3 |
7/21 |
$816,315 |
|
|
$537,366 |
|
1.6.1 |
Sensors |
11/3 |
7/8 |
$188,600 |
|
|
$13,696 |
|
1.6.1.1 |
Probe Stations Ready |
11/3 |
11/3 |
$0 |
|
|
$0 |
|
1.6.1.2 |
Design short sensors |
12/17 |
1/23 |
$0 |
FNAL |
EQU |
$4,336 |
|
1.6.1.3 |
Design long sensors |
12/17 |
1/23 |
$0 |
FNAL |
EQU |
$4,336 |
|
1.6.1.4 |
Vendor RFQ |
1/26 |
2/6 |
$0 |
FNAL |
EQU |
$264 |
|
1.6.1.5 |
Conduct sensor production readiness review |
1/26 |
1/30 |
$0 |
FNAL |
EQU |
$1,020 |
|
1.6.1.6 |
Prepare sensor req and PO |
2/9 |
3/19 |
$0 |
SUNYSB |
INK-MRI1 |
$0 |
|
1.6.1.7 |
Release Sensors for Production |
3/19 |
3/19 |
$0 |
|
|
$0 |
|
1.6.1.8 |
Produce sensors |
3/22 |
9/22 |
$161,000 |
SUNYSB |
INK-MRI1 |
$0 |
|
1.6.1.9 |
Probe sensors (FNAL) |
9/23 |
11/17 |
$500 |
FNAL |
EQU |
$1,088 |
|
1.6.1.10 |
Probe sensors (MRI) |
9/23 |
11/17 |
$24,500 |
SUNYSB |
INK-MRI1 |
$0 |
|
1.6.1.11 |
Long-term sensor tests |
9/23 |
7/8 |
$500 |
FNAL |
EQU |
$2,652 |
|
1.6.1.12 |
Irradiate test structures |
10/21 |
11/17 |
$2,100 |
KSU |
INK-MRI1 |
$0 |
|
1.6.1.13 |
All Sensors Delivered and Tested |
11/17 |
11/17 |
$0 |
|
|
$0 |
|
1.6.2 |
Readout Electronics |
11/3 |
6/9 |
$374,962 |
|
|
$167,108 |
|
1.6.2.1 |
SVX4 Chips Available |
1/5 |
1/5 |
$0 |
|
|
$0 |
|
1.6.2.2 |
SASEQ Test Stands Available |
11/3 |
11/3 |
$0 |
|
|
$0 |
|
1.6.2.3 |
Hybrids |
12/17 |
1/19 |
$70,300 |
|
|
$19,772 |
|
1.6.2.3.1 |
Design hybrids |
12/17 |
1/30 |
$3,000 |
FNAL |
EQU |
$11,300 |
|
1.6.2.3.2 |
Conduct hybrid production readiness review |
2/2 |
2/6 |
$0 |
FNAL |
EQU |
$1,100 |
|
1.6.2.3.3 |
Bid hybrid production |
2/9 |
2/27 |
$0 |
FNAL |
EQU |
$468 |
|
1.6.2.3.4 |
Prepare hybrid req and PO |
3/1 |
3/26 |
$0 |
FNAL |
EQU |
$312 |
|
1.6.2.3.5 |
Release Hybrids for Production |
3/26 |
3/26 |
$0 |
|
|
$0 |
|
1.6.2.3.6 |
Produce hybrids |
3/29 |
7/6 |
$34,860 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.3.7 |
Procure parts (FNAL) |
2/9 |
4/30 |
$0 |
FNAL |
EQU |
$3,192 |
|
1.6.2.3.8 |
Procure parts (Fresno) |
2/9 |
4/30 |
$11,980 |
CALF |
INK-MRI1 |
$0 |
|
1.6.2.3.9 |
Hybrid Boxes Available |
7/6 |
7/6 |
$0 |
|
|
$0 |
|
1.6.2.3.10 |
Test Hybrids |
7/7 |
1/19 |
$20,460 |
|
|
$3,400 |
|
1.6.2.3.10.1 |
Develop functionality test (Fresno) |
7/7 |
8/3 |
$1,600 |
CALF |
INK-MRI1 |
$0 |
|
1.6.2.3.10.2 |
Develop hybrid burn-in test (KU) |
8/4 |
8/31 |
$400 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.3.10.3 |
Develop hybrid burn-in test (FNAL) |
8/4 |
8/31 |
$0 |
FNAL |
EQU |
$3,120 |
|
1.6.2.3.10.4 |
Wipe hybrids |
7/7 |
7/20 |
$0 |
FNAL |
EQU |
$280 |
|
1.6.2.3.10.5 |
Measure hybrids (mechanical) |
7/21 |
8/10 |
$600 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.3.10.6 |
Probe bare hybrids |
7/21 |
8/31 |
$6,000 |
CALF |
INK-MRI1 |
$0 |
|
1.6.2.3.10.7 |
Stuff and wirebond hybrids |
9/1 |
10/27 |
$6,760 |
CALF |
INK-MRI1 |
$0 |
|
1.6.2.3.10.8 |
Perform initial functionality test |
10/28 |
11/24 |
$4,100 |
CALF |
INK-MRI1 |
$0 |
|
1.6.2.3.10.9 |
Perform hybrid burn-in tests |
11/11 |
1/19 |
$1,000 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.3.11 |
All L0 Hybrids Delivered, Stuffed, and Tested |
1/19 |
1/19 |
$0 |
|
|
$0 |
|
1.6.2.4 |
Analog Cables |
11/3 |
9/29 |
$106,200 |
|
|
$10,264 |
|
1.6.2.4.1 |
Design analog cables and spacers |
11/3 |
2/6 |
$0 |
FNAL |
EQU |
$8,304 |
|
1.6.2.4.2 |
Conduct analog cable production readiness review |
2/9 |
2/13 |
$0 |
FNAL |
EQU |
$1,960 |
|
1.6.2.4.3 |
Bid analog cable production |
2/16 |
2/27 |
$0 |
BRN |
INK-MRI1 |
$0 |
|
1.6.2.4.4 |
Prepare analog cable req and PO |
3/1 |
3/26 |
$800 |
BRN |
INK-MRI1 |
$0 |
|
1.6.2.4.5 |
Release Analog Cables for Production |
3/26 |
3/26 |
$0 |
|
|
$0 |
|
1.6.2.4.6 |
Produce analog cables |
3/29 |
7/20 |
$103,400 |
BRN |
INK-MRI1 |
$0 |
|
1.6.2.4.7 |
Test analog cables |
7/21 |
9/29 |
$2,000 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.4.8 |
All Analog Cables Delivered and Tested |
9/29 |
9/29 |
$0 |
|
|
$0 |
|
1.6.2.5 |
Flex Grounding Circuits |
2/2 |
4/16 |
$15,580 |
|
|
$6,160 |
|
1.6.2.5.1 |
Design grounding circuits |
2/2 |
2/27 |
$0 |
FNAL |
EQU |
$4,400 |
|
1.6.2.5.2 |
Bid grounding circuits |
3/1 |
3/12 |
$0 |
FNAL |
EQU |
$440 |
|
1.6.2.5.3 |
Procure grounding circuits |
3/15 |
4/9 |
$15,580 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.5.4 |
Test grounding circuits |
4/12 |
4/16 |
$0 |
FNAL |
EQU |
$1,320 |
|
1.6.2.6 |
Digital Cables |
1/9 |
8/24 |
$30,429 |
|
|
$0 |
|
1.6.2.6.1 |
Design digital cables |
1/9 |
2/6 |
$6,000 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.6.2 |
Conduct digital cable production readiness review |
2/9 |
2/13 |
$0 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.6.3 |
Bid digital cable production |
2/16 |
3/12 |
$0 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.6.4 |
Prepare digital cable req and PO |
3/15 |
4/9 |
$0 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.6.5 |
Release Digital Cables for Production |
4/9 |
4/9 |
$0 |
|
|
$0 |
|
1.6.2.6.6 |
Produce digital cables |
4/12 |
7/6 |
$13,569 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.6.7 |
Terminate digital cables |
7/7 |
7/27 |
$9,860 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.6.8 |
Test digital cables |
7/28 |
8/24 |
$1,000 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.6.9 |
All Digital Cables Delivered and Tested |
8/24 |
8/24 |
$0 |
|
|
$0 |
|
1.6.2.7 |
Twisted-Pair Cables |
1/9 |
10/13 |
$27,253 |
|
|
$10,232 |
|
1.6.2.7.1 |
Design twisted-pair cables |
1/9 |
1/23 |
$0 |
FNAL |
EQU |
$6,096 |
|
1.6.2.7.2 |
Conduct twisted-pair cable production readiness review |
1/26 |
1/30 |
$0 |
FNAL |
EQU |
$1,640 |
|
1.6.2.7.3 |
Bid twisted-pair cable production |
2/2 |
2/27 |
$0 |
FNAL |
EQU |
$624 |
|
1.6.2.7.4 |
Prepare twisted-pair cable req and PO |
3/1 |
3/26 |
$0 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.7.5 |
Release Twisted-pair Cables for Production |
3/26 |
3/26 |
$0 |
|
|
$0 |
|
1.6.2.7.6 |
Procure parts for twisted-pair cables |
3/29 |
6/21 |
$5,886 |
FNAL |
EQU |
$1,872 |
|
1.6.2.7.7 |
Assemble twisted-pair cables |
6/22 |
9/15 |
$20,867 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.7.8 |
Test twisted-pair cables |
9/16 |
10/13 |
$500 |
KU |
INK-MRI1 |
$0 |
|
1.6.2.7.9 |
All Twisted-pair Cables Assembled and Tested |
10/13 |
10/13 |
$0 |
|
|
$0 |
|
1.6.2.8 |
Junction Cards |
12/17 |
7/20 |
$24,280 |
|
|
$0 |
|
1.6.2.8.1 |
Design junction cards |
12/17 |
3/19 |
$6,400 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.8.2 |
Conduct junction card production readiness review |
3/22 |
3/26 |
$600 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.8.3 |
Prepare junction card req and PO |
3/29 |
4/23 |
$960 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.8.4 |
Release Junction Cards for Production |
4/23 |
4/23 |
$0 |
|
|
$0 |
|
1.6.2.8.5 |
Produce junction cards |
4/26 |
6/21 |
$14,400 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.8.6 |
Test junction cards |
6/22 |
7/20 |
$1,920 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.8.7 |
All Junction Cards Produced and Tested |
7/20 |
7/20 |
$0 |
|
|
$0 |
|
1.6.2.9 |
Adapter Cards |
11/3 |
2/23 |
$93,920 |
|
|
$7,840 |
|
1.6.2.9.1 |
Design adapter cards |
11/3 |
3/5 |
$27,520 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.9.2 |
Procure prototypes |
3/8 |
4/30 |
$9,600 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.9.3 |
Test prototypes |
5/3 |
5/28 |
$6,400 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.9.4 |
Develop final specifications (KSU) |
8/18 |
9/15 |
$2,400 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.9.5 |
Develop final specifications (Fermilab) |
8/18 |
9/15 |
$0 |
FNAL |
EQU |
$7,840 |
|
1.6.2.9.6 |
Conduct adapter card production readiness review |
9/16 |
9/22 |
$1,600 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.9.7 |
Bid adapter card production |
9/23 |
10/13 |
$0 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.9.8 |
Prepare adapter card req and PO |
10/14 |
11/10 |
$0 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.9.9 |
Release Adapter Cards for Production |
11/10 |
11/10 |
$0 |
|
|
$0 |
|
1.6.2.9.10 |
Produce adapter cards |
11/11 |
1/26 |
$38,400 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.9.11 |
Test adapter cards |
1/27 |
2/23 |
$8,000 |
KSU |
INK-MRI1 |
$0 |
|
1.6.2.9.12 |
All Adapter Cards Delivered and Tested |
2/23 |
2/23 |
$0 |
|
|
$0 |
|
1.6.2.10 |
High-Voltage System |
6/1 |
11/17 |
$5,000 |
|
EQU |
$14,360 |
|
1.6.2.10.1 |
Design HV System |
6/1 |
8/10 |
$0 |
FNAL |
EQU |
$8,800 |
|
1.6.2.10.2 |
Release HV System for Production |
8/10 |
8/10 |
$0 |
|
|
$0 |
|
1.6.2.10.3 |
Produce HV System |
8/11 |
10/20 |
$5,000 |
FNAL |
EQU |
$1,560 |
|
1.6.2.10.4 |
Test HV System |
10/21 |
11/17 |
$0 |
FNAL |
EQU |
$4,000 |
|
1.6.2.11 |
Readout Chain Integration |
11/3 |
6/2 |
$0 |
FNAL |
EQU |
$73,320 |
|
1.6.2.12 |
Full Chain Tests |
11/3 |
6/9 |
$2,000 |
|
|
$25,160 |
|
1.6.2.12.1 |
Test mixed SVX2/SVX4 readout |
11/3 |
4/30 |
$0 |
FNAL |
EQU |
$5,280 |
|
1.6.2.12.2 |
Test adapter card schemes |
5/24 |
8/17 |
$0 |
FNAL |
EQU |
$6,600 |
|
1.6.2.12.3 |
Move test setup to Lab C |
8/18 |
8/31 |
$2,000 |
FNAL |
EQU |
$1,360 |
|
1.6.2.12.4 |
Test with final adapter cards |
2/17 |
4/13 |
$0 |
FNAL |
EQU |
$7,520 |
|
1.6.2.12.5 |
Test full, final system |
4/14 |
6/9 |
$0 |
FNAL |
EQU |
$4,400 |
|
1.6.2.12.6 |
Full Chain System Test Completed |
6/9 |
6/9 |
$0 |
|
|
$0 |
|
1.6.3 |
Mechanical Design and Fabrication |
11/3 |
9/22 |
$147,548 |
|
|
$151,872 |
|
1.6.3.1 |
Support Structures Design |
11/3 |
2/13 |
$30,564 |
|
|
$0 |
|
1.6.3.1.1 |
Design mechanical structures |
11/3 |
12/16 |
$14,040 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.1.2 |
Conduct finite element analysis (mechanical) |
11/3 |
12/16 |
$3,550 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.1.3 |
Freeze Mechanical Parameters |
12/16 |
12/16 |
$0 |
|
|
$0 |
|
1.6.3.1.4 |
Design cooling components/assembly |
12/17 |
1/15 |
$3,510 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.1.5 |
Conduct finite element analysis (thermal) |
12/17 |
1/15 |
$1,704 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.1.6 |
Integrate designs (sensors, grounding, cooling) |
1/16 |
1/30 |
$3,880 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.1.7 |
Prepare drawings |
2/2 |
2/13 |
$3,880 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.2 |
Development and integration of design (FNAL) |
12/17 |
6/28 |
$10,000 |
FNAL |
EQU |
$143,000 |
|
1.6.3.3 |
Production Readiness Review |
2/16 |
2/20 |
$776 |
|
|
$816 |
|
1.6.3.3.1 |
Conduct production readiness review (UW) |
2/16 |
2/20 |
$776 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.3.2 |
Conduct production readiness review (Fermilab) |
2/16 |
2/20 |
$0 |
FNAL |
EQU |
$816 |
|
1.6.3.3.3 |
Support Structures Ready For Production |
2/20 |
2/20 |
$0 |
|
|
$0 |
|
1.6.3.4 |
Final Fabrication Tooling |
2/23 |
4/9 |
$21,276 |
|
|
$0 |
|
1.6.3.4.1 |
Design final production tooling |
2/23 |
3/12 |
$5,820 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.4.2 |
Prepare final production tooling drawings |
3/15 |
3/26 |
$3,880 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.4.3 |
Fabricate final production tooling |
3/29 |
4/9 |
$11,576 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.5 |
Final Quality Assurance Tooling |
2/23 |
4/9 |
$24,262 |
|
|
$0 |
|
1.6.3.5.1 |
Design final QA tooling |
2/23 |
3/12 |
$5,820 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.5.2 |
Prepare final QA tooling drawings |
3/15 |
3/26 |
$3,880 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.5.3 |
Fabricate final QA tooling |
3/29 |
4/9 |
$14,562 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.6 |
Produce preproduction samples for testing |
4/12 |
5/21 |
$17,020 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.7 |
Final Support Structures Production |
2/2 |
8/24 |
$43,650 |
|
|
$0 |
|
1.6.3.7.1 |
Prepare final production and assembly drawings |
2/2 |
2/13 |
$3,880 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.7.2 |
Procure/manufacture final production parts |
5/24 |
7/6 |
$26,114 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.7.3 |
Assemble final support structures |
7/7 |
8/3 |
$5,296 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.7.4 |
Perform quality assurance checks on final support structures |
8/4 |
8/17 |
$8,160 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.7.5 |
All Support Structures Completed |
8/17 |
8/17 |
$0 |
|
|
$0 |
|
1.6.3.7.6 |
Ship to Fermilab |
8/18 |
8/24 |
$200 |
UW |
INK-MRI1 |
$0 |
|
1.6.3.7.7 |
All Support Structures Received At Fermilab |
8/24 |
8/24 |
$0 |
|
|
$0 |
|
1.6.3.8 |
Perform final article QA checks of support structure components/assemblies |
8/25 |
9/22 |
$0 |
FNAL |
EQU |
$8,056 |
|
1.6.4 |
Layer 0 Detector Modules |
11/3 |
5/16 |
$19,505 |
|
|
$76,932 |
|
1.6.4.1 |
Fabricate module boxes |
3/15 |
6/7 |
$9,600 |
KU |
INK-MRI1 |
$0 |
|
1.6.4.2 |
Module Burn-in Stands Available |
11/3 |
11/3 |
$0 |
|
|
$0 |
|
1.6.4.3 |
Production Module Fixtures |
2/23 |
7/27 |
$7,700 |
|
|
$23,320 |
|
1.6.4.3.1 |
Finalize readout module fabrication fixtures |
2/23 |
3/19 |
$0 |
FNAL |
EQU |
$15,200 |
|
1.6.4.3.2 |
Procure production layer 0 readout module fixtures |
3/22 |
7/13 |
$5,800 |
MSU |
INK-MRI1 |
$0 |
|
1.6.4.3.3 |
QC production readout module fixtures |
7/14 |
7/27 |
$0 |
FNAL |
EQU |
$4,520 |
|
1.6.4.3.4 |
Finalize L0 wirebonding fixtures |
3/1 |
3/12 |
$0 |
FNAL |
EQU |
$2,780 |
|
1.6.4.3.5 |
Procure production L0 wirebonding fixtures |
3/15 |
6/7 |
$1,900 |
KU |
INK-MRI1 |
$0 |
|
1.6.4.3.6 |
QC production L0 wirebonding fixtures |
6/8 |
6/14 |
$0 |
FNAL |
EQU |
$820 |
|
1.6.4.4 |
Preproduction Modules |
7/28 |
1/4 |
$617 |
|
|
$24,180 |
|
1.6.4.4.1 |
Qualify fixtures and procedures |
7/28 |
9/22 |
$100 |
FNAL |
EQU |
$16,080 |
|
1.6.4.4.2 |
Produce preproduction modules |
11/29 |
12/10 |
$517 |
FNAL |
EQU |
$6,260 |
|
1.6.4.4.3 |
Test preproduction modules |
12/13 |
1/4 |
$0 |
FNAL |
EQU |
$1,840 |
|
1.6.4.5 |
Conduct L0 module production readiness review |
1/5 |
1/11 |
$0 |
FNAL |
EQU |
$680 |
|
1.6.4.6 |
Module Production |
1/12 |
5/16 |
$1,588 |
|
|
$28,752 |
|
1.6.4.6.1 |
Silicon L0 Module Production Begun |
1/18 |
1/18 |
$0 |
|
|
$0 |
|
1.6.4.6.2 |
Prepare sensors for module production |
1/12 |
3/9 |
$1,058 |
FNAL |
EQU |
$3,264 |
|
1.6.4.6.3 |
Align and glue pair of flex cables |
1/18 |
3/14 |
$30 |
FNAL |
EQU |
$2,448 |
|
1.6.4.6.4 |
Align and glue sensor to flex cable |
1/20 |
3/16 |
$470 |
FNAL |
EQU |
$2,448 |
|
1.6.4.6.5 |
Perform sensor-to-flex cable wirebonds |
1/24 |
3/18 |
$0 |
FNAL |
EQU |
$3,888 |
|
1.6.4.6.6 |
Attach end hybrids to flex cable |
1/26 |
3/22 |
$30 |
FNAL |
EQU |
$2,448 |
|
1.6.4.6.7 |
Wirebond end hybrid to flex cable |
1/28 |
3/24 |
$0 |
FNAL |
EQU |
$3,888 |
|
1.6.4.6.8 |
Silicon L0 Module Production Complete |
3/24 |
3/24 |
$0 |
|
|
$0 |
|
1.6.4.6.9 |
Debug sensor modules |
2/1 |
3/28 |
$0 |
FNAL |
EQU |
$5,280 |
|
1.6.4.6.10 |
Burn-in sensor modules |
2/8 |
4/4 |
$0 |
FNAL |
EQU |
$0 |
|
1.6.4.6.11 |
Evaluate and repair sensor modules |
2/22 |
4/18 |
$0 |
FNAL |
EQU |
$5,088 |
|
1.6.4.6.12 |
Perform quality assurance tests |
2/8 |
5/16 |
$0 |
FNAL |
EQU |
$0 |
|
1.6.4.6.13 |
Silicon L0 Module Production and Testing Complete |
5/16 |
5/16 |
$0 |
|
|
$0 |
|
1.6.5 |
Final Detector Integration and Assembly |
11/3 |
7/21 |
$49,700 |
|
|
$104,462 |
|
1.6.5.1 |
Layer 0 Support Structure Holding Fixtures |
2/16 |
5/14 |
$5,000 |
|
|
$9,528 |
|
1.6.5.1.1 |
Design support structure holding fixtures |
2/16 |
3/12 |
$0 |
FNAL |
EQU |
$7,600 |
|
1.6.5.1.2 |
Procure support structure holding fixtures |
3/15 |
5/7 |
$5,000 |
KU |
INK-MRI1 |
$0 |
|
1.6.5.1.3 |
QC support structure holding fixtures |
5/10 |
5/14 |
$0 |
FNAL |
EQU |
$1,928 |
|
1.6.5.2 |
Layer 0 Module Installation Fixtures |
2/16 |
7/13 |
$12,000 |
|
|
$16,988 |
|
1.6.5.2.1 |
Design module installation fixtures |
2/16 |
4/9 |
$0 |
FNAL |
EQU |
$15,200 |
|
1.6.5.2.2 |
Procure module installation fixtures |
4/12 |
7/6 |
$12,000 |
MSU |
INK-MRI1 |
$0 |
|
1.6.5.2.3 |
QC module installation fixtures |
7/7 |
|