|
|
Information for
the November 2001 PAC Meeting from
the DØ Experiment |
|
Run 2b Main Documents for
Program Advisory Committee:
One page cover letter. ß read this first
Run 2b Silicon Technical Design Report
Schedule
Cost Estimate
Run 2b Trigger Conceptual Design Report
We direct the Committee to the following document for a more complete discussion of the DØ Run 2 physics program than we have opted to include in the two Design Reports.
The current status of DØ in Run 2a is described in the following document:
Talks given at the PAC meeting on November 2, 2001:
“Status of DØ”, J.Womersley
“Silicon Run 2b Upgrade”, M.Demarteau
“Trigger Upgrades Run 2b”, D.Wood
“Run 2b Project”, J.Kotcher
|
NOTE FOR PRINTING PDF DOCUMENTS: We recommend printing all documents with Acrobat Reader version 4.0 or 5.0. We have tested that Acrobat 4.0 and 5.0 work. However there are printing problems with some documents in Acrobat 3.0 Reader. |
Last updated:
November 1, 2001.