Run 2b Director’s Review:
July 15, 16 2004
Review Final Report
The final report can be found here.
Review Charge
The review charge can be found here.
Agenda
Thursday July 15 Racetrack (WH7X)
1- Installation and Commissioning Racetrack
2- AFE II Committium
FTE estinates for installation
Additional documents
Past Project Documentation of Special Interest
Web page from the November 5, 2003 DZero Run IIb Rebaselining Review
DZero Run IIb Upgrade Technical Design Report (September 12, 2002)
Silicon Layer 0 Conceptual Design Report (October 28, 2003)
AFE documents
D0 Notes:
3898 (“Design of the New MCM”)
4009 (“MCM II and the TriP Chip”)
4076 (“Characterization of the TriP Chip Running at 132 nsec Using a Modified AFE Board”)
4233 (“Proposal for the continuation of the development of AFEII”)
4497 (“Z-coordinate Measurement in CFT and the Track Search”)
4500 (“Problems with the AFE operation at high rates”)
Additional AFE Documentation:
Silicon
Layer 0 schedule (as of
Trigger MPP
schedule (as of
Online MPP
schedule (as of
Installation
MPP schedule(as of