Department of Energy External Independent Review of the Run IIb D-Zero Detector Project November 2002 |
This web page contains links to documents describing the
design, cost, schedule, and management for the Run IIb D-Zero Detector
Project. This material reflects the
guidance given by the September DOE Baseline Review. The five Cost Book
binders, which provide detailed supporting documentation for the Basis of
Estimate, only exist in paper format.
They will be available during the review.
Documentation from the DOE Baseline Review
Web
Page for the DOE Baseline Review (September 2002)
Baseline Review Report (not yet available)
Talks prepared for breakout sessions of the DOE Baseline Review
Silicon (WBS 1.1)
Trigger (WBS 1.2)
Installation (WBS 1.5)