|
|
Documentation
from the DØ Experiment April 2002
Director’s Review of the Run 2b Projects |
|
Note that many documents are
in four separate parts:
Silicon, Level 1 Trigger,
Level 2 Trigger, and Online System
One page cover letter ß read this first
Trigger and Online Upgrade TDR
Silicon, Level 1, Level 2, Online
Project Schedule
Silicon,
Level
1, Level
2, Online
Silicon, Level 1, Level 2, Online
Executive Summary for WBS Dictionary
M&S Cost Basis of Estimate
Silicon, Level 1, Level 2, Online
Project Execution Plan (in preparation)
Materials Provided for the April 2002 PAC Meeting
April
2002 PAC WEB page, including D0 presentations
Responses to the December ’01 Director’s Technical Review Committee
Simulation studies of the Silicon Detector and scope options
|
NOTE FOR PRINTING PDF DOCUMENTS: We recommend printing all documents with Acrobat Reader version 4.0 or 5.0. We have tested that Acrobat 4.0 and 5.0 work. However there are printing problems with some documents in Acrobat 3.0 Reader. |
Last updated: April 5, 2002,R. Partridge.