The following is a set of links to writeups for D0SMT construction and testing. Most are in draft form.  Eventually they will be combined into one or more NIM papers describing the overall project.  Please direct comments to the authors.
 

  • SMT Barrel Assembly
  • Production Testing (D0 note 3841)
  • Results for Silicon Microstrip Detector Testing at Micron (D0 Note 3795)
  • F Disk Construction
  • BLM Calibration (preliminary)
  • The construction and performance of the 6-chip silicon ladders for the DZERO silicon main tracker (D0 Note 3846)
  • The phenomenology of the micro discharge effects on DZERO silicon modules (D0 Note 3804)
  • What do we know about radiation damage in silicon detectors (D0 Note 3803)
  • Test results for the F--Disk and 90^o-stereo Silicon Microstrip Detectors (D0 Note 3601)

  •