D0SMT Writeups
The following is a set of links to writeups for D0SMT construction
and testing. Most are in draft form. Eventually they will be combined
into one or more NIM papers describing the overall project. Please
direct comments to the authors.
SMT
Barrel Assembly
Production
Testing (D0 note 3841)
Results
for Silicon Microstrip Detector Testing at Micron (D0 Note 3795)
F
Disk Construction
BLM
Calibration (preliminary)
The
construction and performance of the 6-chip silicon ladders for the DZERO
silicon main tracker (D0 Note 3846)
The
phenomenology of the micro discharge effects on DZERO silicon modules
(D0 Note 3804)
What
do we know about radiation damage in silicon detectors
(D0 Note 3803)
Test
results for the F--Disk and 90^o-stereo Silicon Microstrip Detectors (D0
Note 3601)