Fiber Tracker Meeting Minutes
August 5, 2003 - 10am, Farside
- CFT Electronics Status : Borcherding
- status slide
- major board swap this last week
- plot of results from unused channel fix
- occupancy dropped from ~70% to >1% in most cases
- plot not shown
- plot not shown
- will be testing 53MHz option during shutdown
- 2 modified boards are in right now: 4B5 and 5A7
- every board from now on will be tested at 53MHz
- VSVX-tick #:
- changes made and tested at CTS, but there are hitches to putting these
down on platform
- print of event dump
- turning off resulted in 128 extra bits going to 2 extra bits (don't know why
it didn't go to zero). Call it a qualified success
- "latched" VLPC
- have a draft of after-access procedures
- Status and plans for shutdown : Borcherding
- Summer shutdown schedule
- major:
- pull and modify LVPS's
- pull and modify ALL AFE boards
- minor:
- install AC remote shutoff
- fix monitoring
- finish LED pulser boards and cabling
- new firmware
- AFE and SEQ slot fixes
Calibration/data quality : Warchol
- talk slides
- Alarming Temperature read-backs
- most fixed by jiggling bayonnet
- new behavior in 8A1
FPD readout status and update : Avila
- talk slides
- TPP - transition patch panel (interface to AFE)
- FPD noise pattern on AFE is due to TPP layout (ground loops)
- a retrofit fix cut noise by a factor of five
- plan to present weekly updates here to get suggestions for solutions
- want to join monitoring with CFT shifter and have pot insertion under control of captain