Fiber Tracker Meeting Minutes
July 8, 2003 - 10am, Farside
- CFT Electronics Status : Borcherding
- one of the links on the platform is not working - will replace next access
- Calibration/data quality : Warchol
- talk slides
- new cable installed from AFE to sequencers
- gray cable moved from channel 3 to channel 4, so now VRB12-channel3 is
connected to sequencer15-channel4
- SDAQ is showing problems with 4B0-4B3 - power cycling gets rid of the problem
- comment from Fred: There are new plots in pdaq examine showing tick and
turn numbers (4 each). Shifters please start looking at these too.
- CTT status : CTT expert
- Other Business
- Bruce Hoeneisen: Continued testing of the Z measurement has reduced the spread from 45cm to 38cm.
Hoping to get it down to 30cm. Need to decide if it is worth continuing efforts -
still need to hear back from tracking people.