CTT RUn2b upgrade - Fermilab Deliverables ------------------------------------------- 1.2.3.8 new DFEA backplane (BP) 1.2.3.9 new DFEA Crate Controller (CC) incl. firmware/software 1.2.3.10 optical Download+Control Link (DCL) For each item above: Time line, Workload estimate/Personnel, cost For BP: hardware specs; for CC+BP+new DFEA: interface/timing specs Detailed specs for CC,DCL are to follow as defined in the time line 1.2.3.9 includes the SCL Receiver for CC (SCLR) (buy from existing FNAL production, or tag on to/copy order)