CTT DFEA upgrade installation + commissioning SG 2004-May-04 ----------------------------------------------- Hardware certification prior to installation: ---------------------------------------------- see Jamieson's document Software: -------- add new (additional) DFEB-CTOC chain to trigsim, both for old and new equations add DFEB, CTOC, CTTT boards to dfe_ware database add download interface for DFEB to dfe_ware/EPICS create link test scripts for Mixer/DFEB/CTOC/CTTT connections add DFEB + new CTOC to CTT_examine add DFEB + new CTOC to CTT offline analysis program Cabling and Installation: ------------------------- C: (cabling job) route optical GbE fibers FCH2 (switch) - platform PC03X (PC03 extension) C: route SCL MCH1 - platform PC03X install 48V PS, 6U crate w/ new backplane; needs operational safety review install splitters in front of mixer; reconnect old LVDS cables Mixer - DFEA run Mixer - DFEA (old) tests C: install extension cables from splitters to new crate once work at Mixer end is complete: full CTT CFT axial + CPS system test if necessary, check input LVDS timing with scope; add splitters and adjust Sequencer timing if necessary back out before end of shutdown if old system can't be made to work with splitters install crate controller hook up optical GbE and SCL establish communication establish basic CC operation install DFEB (new DFEA) establish communication with DFEB establish basic DFEB operation install additional CTOC in PW03-2 install additional CTTT in PW03-2 (optional) C: install LVDS cables DFEB-CTOC C: cables LVDS CTOC - CTTT (optional), LVDS CTTT - MTM (optional), borrow CTQD fiber for readout CTOC - x13 (MCH3) Commissioning: -------------- load doublet (old) equations into DFEB load CTOC (FW must acommodate missing inputs) load CTTT (FW must acommodate missing inputs) (optional) load MTM with map from new CTTT to terms 176-191 (optional) run link tests for all new connections if necessary, check input LVDS timing with scope For a) standard thresholds b) AFE test vectors c) low thresholds verify I/O term rates (optional) compare to rates from old system with same inputs (other inputs disabled/unplugged) (optional) verify x13 output against old system verify x13 output against trigsim (CTT_examine) offline efficiency analysis load singlet (=new) equations verify x13 output against trigsim (CTT_examine) offline efficiency analysis Add modules to secondary system and repeat Iterate new firmware adjusting rates vs. efficiency When operating point for new system is established, and the new DFEB crates are ready, remove DFEA crates and install DFEB crates establish basic operation for all cards on platform full CTT CFT axial + CPS system test examine and offline checks