Notices

 

Collision hall access will not be available from 1700 to 1800 this evening due to safety system tests.

 

Supervised access to the collision hall should be ending at 1600 on Friday afternoon,  Plan accordingly.

 

The instrumentation on the FPD has been removed.   If you notice any change in operating conditions, please contact a Run Coordinator immediately.

 

Please review the supervised access procedures prior to making access to the collision hall.

 

Please discuss detector related activities with the Run Coordination team to insure that appropriate safety precautions are being taken.

 

The DAQ is back up and available to be exercised.  Please test out subsystems to verify that the detector has fully recovered from the power outages as well as the DAQ upgrades.

 

The detector has been closed and magnets have been successfully ramped to full current.

 

The shutdown duration is expected to be 10 weeks.

      

 

Shutdown Schedule Information

 

Shutdown Schedule Overview xls  pdf   

 

Accelerator Division Schedules

 

Shift Coverage Plan

 

Supervised access keys are to be issued by Captains, Ops shifters, or the Run Coordination team.  Please make sure to return your key before leaving the area.

In addition to the on-call experts, the following shift coverage is anticipated during the majority of the shutdown:

 

       Monday through Friday

                   0000-0800          Ops shifters                                      (DAQ on auto-pilot)

                   0800-1600          Captain and Ops shifters

                   1600-2200          DAQ shifter and Ops shifters

2200-2400          Ops shifters                                      (DAQ on auto-pilot)

 

          Saturday and Sunday

              0000-1000          Ops shifters                                      (DAQ on auto-pilot)

                   1000-1800          DAQ shifter and Ops shifters

                   1800-2400          Ops shifters                                      (DAQ on auto-pilot)

 

 

       DAQ tutorials for Captains

                   Running the DAQ

COOR

                   Data Flow

 

 

 

Additional Reference Information

 

       Fermilab Environment, Safety and Health Section

 

          PPD Hazard Analysis Procedure

 

          PPD Hazard Analysis Form

 

          Calorimeter Gap Access Rules

 

 

          FPD decommissioning procedure and hazard analysis

 

 

 

Mechanical Ops shutdown work list  (latest update 27 July 2007)

 

          Electrical support shutdown work list (latest update 8 August 2007)

 

 

             

       Shutdown Planning (at Conveners Meeting 3 August 2007)

 

Shutdown Preparations (at Operations Meeting on 27 July 2007)

 

       Shutdown Preparations (at Operations Meeting on 13 July 2007)

 

Shutdown Preparations (at Operations Meeting on 29 June 2007)

 

 

Accelerator Division Shutdown Planning (at 9 o’clock meeting on 27 July 2007)

 

 

 