Minutes FPD D0 integration Meeting November 1st Victor Bodyagin, Carlos Avila, Carley P.O. Martins, Andrew Brandt (video), Wanda Prado, Ricardo Ramirez 1) Victor The addresses for all of our boards (AFE, SEQ, VRB) are known. The Data Base (DB) is ready for doing test. Some coordination with Jadzia Warchol and Geoff Savage is required. 2) Carlos AFE The delays of the sequencer must be tested at CTS with John Anderson. For testing the whole chain (Dipole,TPP,AFE,SEQ,VRB) in the final configuration, we will try to use the LMB. Other question is: How do we test timing and check that the Sequencer delay is s etup correctly? For checking with real signals, we will need to see Fibber ADC (SVX counts) for different Sequencer delays. Examine Table map for Dipole Detector is ready. We are coordinating with Abid Patwa the modification for FPS examine in order to convert it to a FPD examine. 3) Carley Some coordination with the Muon team is required. Victor may be able to help, starting middle of next week. The TDC boards were supposed to arrive this week, so we need to ask Brendan Casey about it. 4) Wanda One suggestion about the documentation for the shifter is to have a label at the Top of the screen about the steps for moving Pots out. 5) Ricardo The receiver for CFT, which is almost the same for FPD, has had some problems with glitches generated in the crossing time domain. It requires to improve the control system for reading and writing from RAM memories. The design for the AFE third delay is starting.