D0 cost estimate at WBS level 3

(all documents linked from this page are in pdf format)

overview of all systems

 Tracking System

WBS 1.1

Calorimeter System

WBS 1.2 

Muon System

WBS 1.3 

Trigger System

WBS 1.4 

Online system

WBS 1.5 

 Silicon Tracker

WBS 1.1.1

Front-end Elctronics

WBS 1.2.1 

 Cosmic Ray Scintillator

WBS 1.3.1

Framework

WBS 1.4.1 

Equipment

WBS 1.5.1 

 Fiber Tracker

WBS 1.1.2

ICD

WBS 1.2.2 

Central Trigger Detectors

WBS 1.3.2 

Level 0

WBS 1.4.2

 

 Central Preshower

WBS 1.1.3

 

Forward Trigger Detectors

WBS 1.3.3 

Level 1

WBS 1.4.3 

 

 Forward Preshower

WBS 1.1.4

 

Forward Tracking Detectors

WBS 1.3.4 

Level 2

WBS 1.4.4 

 

 Tracking Electronics

WBS 1.1.5

 

Front-end Electronics

WBS 1.3.5 

Level 3

WBS 1.4.5 

 

The Solenoid (WBS 3.1.1) is an Accelerator Improvement Project (AIP) and is treated separately.

 

Date: June 5, 1999