|
|
||
|
(last update: 4/2/2008) The procedures listed below are in PDF format. A Microsoft Word 2000 document
is available for creating new operating procedures in a standard format. Procedures are dated, and are scheduled to be reviewed (and revised
as appropriate) at a maximum interval of five years. |
||
|
Procedure number format: |
Categories include: EMERG, SAFETY, OP,ELE, MAINT,
ADMIN, OTHER Systems include: SOL, SMT, FT, CPS, FPS, |
|
|
|
|
|
|
Procedure Number |
Title |
Status |
|
|
|
|
|
|
|
|
|
Fire Alarm - |
Approved-under review |
|
|
VESDA Alarms |
Approved-under review |
|
|
Oxygen Deficiency Hazard (ODH) Alarms |
Approved-under review |
|
|
Recovery From Alarms and Emergencies |
Approved-under review |
|
|
Cryogenic Pipe Or Dewar Leak |
Approved-under review |
|
|
Spill Plan |
Approved-under review |
|
|
Potential Radiation Exposure |
Approved-under review |
|
|
Severe Weather |
Approved-under review |
|
|
|
|
|
|
|
|
|
|
DØ-SAFETY-BLDG-001 |
Search And Secure-Open Configuration |
Consult MCR (x3721) |
|
Radiation Survey-Closed Detector Configuration |
Approved-under review |
|
|
Controlled Access-Collision Hall |
Approved-5/2/2005 |
|
|
Supervised Access-Collision Hall |
Approved-8/3/2007 |
|
|
Collision Hall Configuration Control |
Approved-under review |
|
|
D Ø-SAFETY-BLDG-006 |
Search And Secure-Closed Configuration |
Consult MCR (x3721) |
|
Magnet Power On Access - DØ Collision Hall |
Approved-under review |
|
|
Solenoid Fringe Field Survey Controlled Access
- DØ Collision Hall |
Approved-5/2/2005 |
|
|
|
|
|
|
|
|
|
|
Mitigating The Possibility Of Contact With High
Voltage While Working On Liquid Argon Calorimeter Systems |
Approved-under review |
|
|
|
Issuing Of Temporary/Visitor (Red) TLD Badges -
Instructions for D-Zero Shift Captains |
Approved-under review |
|
Mitigating The Possibility Of Contact With High
Voltage While Working On Intercryostat Detector Systems |
Approved-under review |
|
|
Mitigating The Possibility Of Contact With High
Voltage While Working On Muon Detector Systems |
Approved-under review |
|
|
BLS To/From Detector Platform Racks |
Approved-6/20/2007 |
|
|
BLS To/From Collision Hall |
Approved-6/20/2007 |
|
|
Operation Of Silicon Detector Dry Gas Purge
System |
Consult Mech Ops (x2849) |
|
|
Initial Startup Of The D0 Silicon Detector
Cooling System |
Consult Mech Ops (x2849) |
|
|
D0-OP-SMT-003 |
Checking Silicon Detector Cooling System
Interlock Functions |
Consult Mech Ops (x2849) |
|
D0-OP-SMT-004 |
Operating The Silicon Detector Cooling System
Vacuum Pumps |
Consult Mech Ops (x2849) |
|
D0-OP-SMT-005 |
Operating The Nitrogen Gas Purge System On The
Expansion Tank |
Consult Mech Ops (x2849) |
|
D0-OP-SMT-006 |
Filling The Silicon Detector Cooling System |
Consult Mech Ops (x2849) |
|
D0-OP-SMT-007 |
Draining The Silicon Detector Cooling System |
Consult Mech Ops (x2849) |
|
D0-OP-SMT-008 |
Normal Chiller Operation |
Consult Mech Ops (x2849) |
|
D0-OP-SMT-009 |
Swapping Out A Chiller |
Consult Mech Ops (x2849) |
|
DØ Silicon Detector Radiation Protection |
Approved-under review |
|
|
Mitigating The Possibility Of Contact With
Voltage In Excess of 50 Volts While Working On The SMT System |
Approved-under review |
|
|
|
|
|
|
ELE [top] |
|
|
|
Remove and Replace CFT/SMT Sequencer Power
Supply Chassis |
Approved-11/16/2007 |
|
|
|
|
|
|
Disconnect/Reconnect BLS Power Supply Chassis |
Approved-9/11/2007 |
|
|
Remove and Replace Calorimeter Pre-amp Power
Supply |
Approved-6-28/2007 |
|
|
|
|
|
|
Remove/Replace Muon PDT Power Supplies |
Approved-7/20/2007 |
|
|
Remove/Replace Level 1 Muon Power Supply
Chassis |
Approved-8/21/2007 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DØ-ADMIN-OTHER-001 |
Creating DØ Procedures |
Consult TIC (x6337) |
|
DØ-ADMIN-TRAIN-001 |
Consult ES&H |
|
|
DØ-ADMIN-TRAIN-002 |
Consult ES&H |
|
|
DØ-ADMIN-TRAIN-003 |
Consult ES&H |
|
|
DØ-ADMIN-TRAIN-004 |
Consult ES&H |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|