(last update: 02/02/2012) The procedures listed below are in PDF format. A Microsoft Word 2000 document
is available for creating new operating procedures in a standard format. Procedures are dated, and are scheduled to be reviewed (and
revised as appropriate) at a maximum interval of five years. |
||
|
Procedure number format: |
Categories include: EMERG, SAFETY, OP,ELE, MAINT, ADMIN,
OTHER Systems include: SOL,
SMT, FT, CPS, FPS, |
|
|
|
|
|
|
Procedure Number |
Title |
Status |
|
|
|
|
|
|
|
|
|
Fire Alarm - |
Approved-under review |
|
|
VESDA Alarms |
Approved-under review |
|
|
Oxygen Deficiency Hazard (ODH)
Alarms |
Approved-under review |
|
|
Recovery From Alarms and
Emergencies |
Approved-under review |
|
|
Cryogenic Pipe Or Dewar Leak |
Approved-under review |
|
|
Spill Plan |
Approved-under review |
|
|
Potential Radiation Exposure |
Approved-under review |
|
|
Severe Weather |
Approved-under review |
|
|
|
|
|
|
|
|
|
|
DØ-SAFETY-BLDG-001 |
Search And Secure-Open
Configuration |
Consult MCR (x3721) |
|
Controlled Access-Collision Hall |
Consult Tech. Coordinator |
|
|
Supervised Access-Collision Hall |
Consult Tech. Coordinator |
|
|
D Ø-SAFETY-BLDG-006 |
Search And Secure-Closed
Configuration |
Consult MCR (x3721) |
|
|
Approved-01/31/12 |
|
|
Collision Hall Access |
Under review |
|
|
Solenoid Fringe Field Survey
Controlled Access - DØ Collision Hall |
Approved-5/2/2005 |
|
|
Calorimeter Gap Access Rules |
Reviewed each gap access |
|
|
|
|
|
|
BLS To/From Detector Platform
Racks |
Approved-10/20/2009 |
|
|
BLS To/From Collision Hall |
Approved-10/20/2009 |
|
|
Operation Of Silicon Detector
Dry Gas Purge System |
Consult Mech
Ops (x2849) |
|
|
Initial Startup Of The D0
Silicon Detector Cooling System |
Consult Mech
Ops (x2849) |
|
|
D0-OP-SMT-003 |
Checking Silicon Detector
Cooling System Interlock Functions |
Consult Mech
Ops (x2849) |
|
D0-OP-SMT-004 |
Operating The Silicon Detector
Cooling System Vacuum Pumps |
Consult Mech
Ops (x2849) |
|
D0-OP-SMT-005 |
Operating The Nitrogen Gas Purge
System On The Expansion Tank |
Consult Mech
Ops (x2849) |
|
D0-OP-SMT-006 |
Filling The Silicon Detector
Cooling System |
Consult Mech
Ops (x2849) |
|
D0-OP-SMT-007 |
Draining The Silicon Detector
Cooling System |
Consult Mech
Ops (x2849) |
|
D0-OP-SMT-008 |
Normal Chiller Operation |
Consult Mech
Ops (x2849) |
|
D0-OP-SMT-009 |
Swapping Out A Chiller |
Consult Mech
Ops (x2849) |
|
DØ Silicon Detector Radiation
Protection |
Approved-under review |
|
|
Issuing of Temporary Dosimetry Badges at DØ |
Approved-04/16/2009 |
|
|
ELE [top] |
|
|
|
Remove and Replace CFT/SMT
Sequencer Power Supply Chassis |
Approved-11/16/2007 |
|
|
|
|
|
|
Disconnect/Reconnect BLS Power
Supply Chassis |
Approved-9/11/2007 |
|
|
Remove and Replace Calorimeter
Pre-amp Power Supply |
Approved-6-28/2007 |
|
|
|
|
|
|
Remove/Replace Muon PDT Power
Supplies |
Approved-3/10/2010 |
|
|
Remove/Replace Level 1 Muon
Power Supply Chassis |
Approved-8/21/2007 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DØ-ADMIN-OTHER-001 |
Creating DØ Procedures |
Consult TIC (x6337) |
|
DØ-ADMIN-TRAIN-001 |
Consult ES&H |
|
|
DØ-ADMIN-TRAIN-002 |
Consult ES&H |
|
|
DØ-ADMIN-TRAIN-003 |
Consult ES&H |
|
|
DØ-ADMIN-TRAIN-004 |
Consult ES&H |
|
|
|
|
|
|
|
|
|
|
|
28-Jan-2010 |
|
|
|
Site
Access via East Gate (between 0100 and 0500) for Operational Issues |
12-Jan-2010 |